ISV Achievements for 2008 - Costa Rica

During 2008, ISV’s participants supported a number of Conservation and Community Development projects across the country, mainly improving life standards of local villagers and producing valuable data on scientific research. In addition to achieve the following material facts, many of the most rewarding achievements imply intangible tasks, especially regarding the social impact into the communities and more than 130 host families. Participant testimonies reflect a life changing and heartwarming experience that proved culturally educational and fun. At the same time, participants made an amazing contribution to positive community development and the conservation of several endangered species of flora and fauna.

Tasks accomplished in Costa Rica by ISV groups During 2008 are:

CONSERVATION PROJECTS

PROJECT

#  STUDENTS

# GROUPS

Widecast - Gandoca

66

5

TASKS ACCOMPLISHED

  • 90 sea turtles and 140 turtle nests protected
  • 6970 turtle eggs relocated
  • 3261 hatchlings released to the sea
  • 77 nests exhumed
  • 1520 hours of hatchery guard
  • 1257 km (781mi) of beach patrolled in 628 hours
  • Over 203 lines of data filled out

PROJECT

#  STUDENTS

# GROUPS

Widecast - Carate

26

2

TASKS ACCOMPLISHED

  • 98 sea turtles and 167 turtle nests protected
  • 6435 turtle eggs relocated
  • 311 hatchlings released to the sea
  • 133 km (82.6 mi) of beach patrolled in 138 hours
  • 9.1 km (5.7 mi) of beach cleaned
  • 1137 m (1243 yd) of mosquito mesh installed at the local school

PROJECT

#  STUDENTS

# GROUPS

Widecast - San San Pond Sak

60

5

TASKS ACCOMPLISHED

  • 46 sea turtles and 51 turtle nests protected
  • 1678 turtle eggs relocated
  • 381 hatchlings released to the sea
  • 45 nests exhumed
  • 550 km (341.8 mi) of beach patrolled in 376 hours
  • 18 hours monitoring behavior of manatees
  • 3 km (1.86 mi) of beach cleaned
  • 96 kg (212 lb) of garbage collected from the beach
  • 32380 kg (71390 lb) of sand carried to build a jetty and a septic tank
  • 250 pineapple seeds planted

PROJECT

#  STUDENTS

# GROUPS

Golfo Dulce Wildlife

61

6

TASKS ACCOMPLISHED

  • 27 boat trips done
  • 296 km (184 mi) traveled by boat following dolphins
  • 73 hours of  wildlife behavior monitored
  • 602 records of dolphins made
  • 4 records of humpback whales made
  • 12 records of false killer whales made
  • 35 frog surveys done
  • 140 km (87 mi) of trails walked searching for frogs
  • 715 records of frogs made
  • 60 saplings planted

PROJECT

#  STUDENTS

# GROUPS

Proyecto Carey

71

7

TASKS ACCOMPLISHED

  • 509 km (316.3 mi) walked searching for fruit-eating mammals
  • 21 focal trees monitored for fruit-eating animal activity for 341 hours,
  • 24 trees monitored for fruit crop size (incorporating 16 new trees into the survey)
  • 0.114 km² (0.044 mi²) surveyed for fruit production
  • 460 seed tags made
  • 1755 seeds tagged
  • 1680 seeds tracked inside the forest
  • 16 seed traps and 99 seed enclosures built
  • 840 m² (9042 ft²) of seed traps checked
  • 1900 lines of data filled out
  • 3 km (1.86 mi) of beach cleaned

PROJECT

#  STUDENTS

# GROUPS

Kèköldi Indigenous Reserve

44

4

TASKS ACCOMPLISHED

  • Over 138 different birds banded
  • Over 310 mist-net hours done
  • 30 km (18.7 mi) walked surveying for mammals - detecting 6 species of them-
  • 151 kg (333 lb) of construction material carried to build trails around the scientific center
  • 60 m³ (13620 gal) of garbage sorted out
  • 1.375 km (0.85 mi) of trails constructed
  • 400 saplings planted

Other accomplishments in the conservation projects:

  • Number of people involved directly:  166
  • Number of people involved indirectly: 171
  • Number of families hosting volunteers: 9

COMMUNITY DEVELOPMENT PROJECTS

 PROJECT

#  STUDENTS

# GROUPS

APECH : El Chirripó Producers Association

17

2

TASKS ACCOMPLISHED

  • 4000 kg (8 818 lb) of cement carried to build
  • 1 water sink built
  • 175 m (191.4 yd) of fence built
  • 140 m (153.1 yd) of draining channels repaired
  • 90 m² (968.8 ft²) of a gathering center built; same gathering center painted
  • 35 m² (376.7 ft²)  of a health center painted
  • 2 murals made
  • 100 m² (1 076 ft²) of ground cleaned to plant trees
  • 58 saplings planted
  • 729 fruit boxes washed
  • 346 tamales (Costa Rican traditional dish) cooked

PROJECT

#  STUDENTS

# GROUPS

ASJUESDE:  Association of Youth United for Ecology & Development of Deer Island

14

2

TASKS ACCOMPLISHED

  • 100 dirt bags carried
  • 24 cement sacks carried
  • 77 m (84.21 yd) of fence built
  • 12 m (13.12 yd) of draining channels repaired
  • 1 hostel repaired and painted
  • 1 flower bed built
  • 1 Host Organization office repaired
  • 1 mural made

PROJECT

#  STUDENTS

# GROUPS

ASOPROLA: Association of La Amistad Producers

18

2

TASKS ACCOMPLISHED

  • 1180 kg (2 601 lb) of dirt carried
  • 1500 kg (3 307 lb) of sand and rocks carried to build
  • 1150 m (1 258 yd) of trail built
  • 6 m² (64.58 ft²) of flower bed built
  • 1 bridge repaired
  • 3 school classrooms (180 m² / 1 938 ft²) painted
  • 200 m² (2 153 ft²) of outer school walls painted
  • 8 m² (86.11 ft²) of tiles placed on the wall and floor of a bus stop

PROJECT

#  STUDENTS

# GROUPS

Canaan: Development Association of Canaán - Perez Zeledón

19

2

TASKS ACCOMPLISHED

  • 1840 blocks and 245 cement sacks carried to build
  • 38650 kg (85 210 lb) of other construction material carried
  • 17 biodigestors (212 m² / 2 282 ft²) built
  • 2 churches painted (905 m² / 9 741 ft²)
  • 1 school painted ( 400 m² / 4 306 ft²)
  • 90 m² (968.8 ft²) of ground cleared

PROJECT

#  STUDENTS

# GROUPS

COCOFOREST: Quizarrá Forest Conservation Committee

18

2

TASKS ACCOMPLISHED

  • 7042 kg (15 520 lb) of cement carried to build
  • 98 m² (1 055 ft²) of a community center built
  • 2400 m (2 625 yd) of trail built
  • 1 school painted
  • 4 murals made
  • 10 signs made
  • 2 vegetable gardens made
  • 1 biodigestor built
  • 12 aqueduct tanks built
  • 144 m² (1 550 ft²) of ground cleared
  • 1843 bags filled with dirt to plant trees

PROJECT

#  STUDENTS

# GROUPS

 

Por La Mar –Tarcoles : Consortium for the Sea

19

2

TASKS ACCOMPLISHED

  • 250 kg (551.2  lb) of sand, 45 blocks and 2 cement sacks carried to build
  • 2 Host Organization offices (9 m² / 96.88 ft²) built / repaired
  • 1 playground repaired
  • 1 compost bin built
  • 1 community hut repaired
  • 1 church repaired
  • 400 m² (4 306 ft²) of two Host Organization offices painted
  • 20 m² (215.3 ft²) of vegetable garden built
  • 4 murals made
  • 5 signs made
  • 25 benches of the central park painted
  • 46 garden-size bags filled with garbage collected from the central park
  • 138 tamales (Costa Rican traditional dish) cooked

PROJECT

#  STUDENTS

# GROUPS

PROTURCO: Association of Tourism Promoters of  Las Colinas

17

2

TASKS ACCOMPLISHED

  • 2000 kg (4 409 lb) of construction material carried to build
  • 27 m² (290.6 ft²) of school cafeteria built
  • 300 m² (3 229 ft²) of a multipurpose concrete platform built
  • 100 m² (1 076 ft²) of classroom walls painted
  • 1 mural made

PROJECT

#  STUDENTS

# GROUPS

APROSAMA: Association of Agro-Forestry Producers & Environmental Management.

10

1

TASKS ACCOMPLISHED

  • 6400 kg (14110 lb) of dirt carried
  • 140 m (153.1 yd) of fence built
  • 16 signs made
  • 1 cement path built at the local cemetery
  • 300 m² (3 229 ft²) of a cemetery chapel built
  • 1 community hut built
  • 1 biodigestor built

PROJECT

#  STUDENTS

# GROUPS

ASOMOBI: Organized Women’s Association of Biolley.

9

1

TASKS ACCOMPLISHED

  • 2000 kg (4 409 lb) of cement and sand carried to build
  • 130 m (142.2 yd) of fence built
  • 20 m² (215.3 ft²) of shed built
  • 55 m² (592 ft²) of hostel built
  • 70 m² (753.5 ft²) of hostel painted
  • 55 m² (592 ft²) of roof boards painted and sanded
  • 450 bags filled with dirt to plant trees
  • 1 mural made

PROJECT

#  STUDENTS

# GROUPS

Alianza  Garabito:  Association for Production and Development

6

1

TASKS ACCOMPLISHED

  • 1 mural made
  • 10 m² (107.6 ft²) of school cafeteria built
  • 10 m² (107.6 ft²) of church classroom built
  • Lots of construction material carried

PROJECT

#  STUDENTS

# GROUPS

ECOMUSEO: Ecomuseum of Chorotegan Ceramics

9

1

TASKS ACCOMPLISHED

  • 200 kg (4 409 lb) of cement carried to build
  • 300 m² (3 229 ft²) of museum building constructed
  • 32 m² (344.4 ft²) of classroom built
  • 32 m (35 yd) of sidewalk painted
  • 204 m² (2 196 ft²) of school walls painted
  • 1 mural made

PROJECT

#  STUDENTS

# GROUPS

EL YÜE: Association of Producer Families

8

1

TASKS ACCOMPLISHED

  • 2450 kg (5 401 lb) of dirt carried
  • 130 blocks carried to build
  • 27 wheelbarrows of dirt and 3 of chopped wood carried
  • 20 m² (215.3 ft²) of parking lot built
  • 40 m² (430.6 ft²) of orchid garden built
  • 4.5 m² (48.44 ft²) of water sink built
  • 4 m² (43.06 ft²) of chicken coop built
  • 2 green filters repaired
  • 2 dumpsters built
  • 4 tables and 14 chairs sanded and painted
  • 340 trees planted
  • 1 compost bin built
  • 4 signs made
  • 212 banana trees with old leaves pulled off
  • 20 fertilizer bags filled with compost

PROJECT

#  STUDENTS

# GROUPS

LAS ORQUÍDEAS: Women Association of Cabinas

10

1

TASKS ACCOMPLISHED

  • 1250 kg (2 756 lb) of dirt carried to build
  • 1500 kg (3 307 lb) of metal frames carried to build
  • 1750 kg (3 858 lb) of cement and sand carried to build
  • 80 m² (861.1 ft²) of orchid garden built
  • 1 ramp for disabled people built
  • 18 m² (193.8 ft²) of school kitchen floor built
  • 1500 m (1 640 yd) of trail repaired
  • 45 m² (484.4 ft²) of outer school walls painted
  • 45 m² (484.4 ft²) of school cafeteria painted
  • 10 m² (107.6ft²) of hostel reception painted
  • 34 chairs sanded
  • 2 murals made
  • 18 signs made

PROJECT

#  STUDENTS

# GROUPS

SANTA ELENA: Association of Women Friends

10

1

TASKS ACCOMPLISHED

  • 90 m² (968.8 ft²) of health center repaired
  • 25 m² (269.1 ft²) of church painted
  • 25 m² (269.1 ft²) of local school painted
  • 1 mural made
  • 1 biodigestor built

PROJECT

#  STUDENTS

# GROUPS

San Juanillo Fishermen Association 9 1

TASKS ACCOMPLISHED

  • 6 m² (64.58 ft²) of recycling center built
  • 24 m² (258.3 ft²) of gathering center painted
  • 1 mural made
  • 3 signs made

Other accomplishments in the community support projects:

  • Number of local people receiving English lessons: 60
  • Number of people involved directly:  296
  • Number of people involved indirectly: 577
  • Number of families hosting volunteers: 129

 

 

 


 